E4 ptact 5 5 1

A quick way to force the sending of VTP advertisements is to change one of the client switches to transparent mode and then back to client mode. For Packet Tracer to grade this task correctly, you must enter the permitted networks in the following order: The password is xyzvtp.

Configure the wireless network settings. Leave all other settings at the default. Implement a basic firewall ACL. The PAP password is ciscopap. You need to connect a cable to the correct interfaces.

This document is Cisco Public Information.

E4_PTAct_8_6_1

Verify connectivity from Outside Host. Configure static and default routing.

E4_PTAct_5_5_2

HQ is using the first address. Because the Branch routers B1, B2, and B3 and switches are designed with scalability in mind, you can reuse scripts. Verify connectivity beyond ISP. However, at any time you can click Check Results to see if a particular component is graded and if you configured it correctly.

Use the next-hop IP address as an argument. HQ is the DCE side of the link. B3 must be manually configured to use IETF encapsulation.

Allow inbound HTTP requests to the www. In addition, you will not be given a specific percentage that should be complete at the end of each task. Verify that connectivity is restored between the routers. This document is Cisco Public Information. Verify that BX-S1 is the root bridge. One student leaves the room, if necessary, while another student breaks the configuration.

The interface normally comes back up on its own if you wait a few seconds. Currently, the PCs are configured to use static IP addresses.

E4_PTAct_7_5_1

Configure the interfaces on R1, R2, and R3. Verify remote management capability by accessing the wireless router through the web browser. Use the following requirements: Verify NAT is operating by using extended ping.

Page 7 of 7 Recommended. However, you are expected to configure them, and your instructor may choose to grade these commands. Configure R1, R2, and R3 with the basic global configuration.

Use the topology diagram to determine which interfaces are DCE interfaces. However, the Outside Host PC should be able to request a web page. B1, B2, and B3 are the spokes. Actividad de PT Desafío de Listas de control de acceso Diagrama de topología Tabla de direccionamiento Interfaz Dirección IP Máscara de subred Gateway.

0 Votos desfavoráveis, marcar como não útil. E4_PTAct_8_6_1. Enviado por idem2n. All three NewB PCs and the NetAdmin PC should be able to ping the makomamoa.com web makomamoa.com 5: Configure Inter-VLAN RoutingStep 1.

Configure each Branch router for inter-VLAN routing. Using the addressing table for Branch routers, configure and activate the LAN interface for inter-VLAN routing.

To test the importance of ACL filtering direction, reapply the std-1 ACL to the Serial 0/0/1 interface.

This This time the ACL will be filtering outbound traffic, rather. Readbag users suggest that Microsoft Word - makomamoa.com is worth reading. The file contains 5 page(s) and is free to view, download or print.

makomamoa.com - Google Docs Sign In.

E4 ptact 5 5 1
Rated 3/5 based on 56 review